A clearer airport story. An honest state of readiness.
November 12, 2026 · Preview-only review. Client colors locked; typography and execution proposed. Supplied first-version logos shown for review.
Verified preview results
48 route responses passed; five screen widths (320, 390, 768, 1024, 1440) showed no overflow on key pages. Desktop/mobile navigation, local inquiry save/readback/reload, storage failure, checklist and keyboard skip link passed. Eighteen targeted tests passed and compilation/TypeScript checks reported success. Button contrast is 6.72:1. This is targeted verification, not full accessibility certification.
Completed in this draft
- Supplied first-version full-name logos in the header and footer, with a matching favicon. Locked coastal palette remains unchanged; bold upright Montserrat headings and a genuine Black Italic 900 homepage tagline complement the logo; Source Sans 3 remains the reading font; FlyPQL variants are unused.
- Two prominent home pathways, visible community access, genuine county photographs and practical corporate/general aviation preparation.
- Business requirements and feasibility qualification; no invented properties, workforce programs, endorsements or economic impact.
- Approval-pending institutional content; no fictional staff, news, document downloads or contact addresses.
- Browser-only inquiry demonstration with truthful readback, no sending and storage failure handling.
- NOAA request correction and distinct missing, stale, unknown and failed-weather states.
Why these priorities
The supplied synthesis covers 21 Brand Discovery questionnaires collected September 14–October 9 and a November 2 workshop reconstruction/partial recap. It is stakeholder input, not a representative public survey or board minutes. Welcoming and dependable were each selected by 18 of 21 respondents; trusted by 12; forward-looking by 9. Anonymous audience multi-select counts are corporate/charter 20 of 21, economic development 18, pilots 16, and aerospace/defense/MRO 15. These counts are supplied evidence, not an independent recount in this build, and do not represent public preferences.
Aviation industry, particularly corporate aviation and MRO, is prominent; military is a secondary consideration, not a claim of current programs. General aviation stays easy to find, and public resources remain visible. The draft explains capability through clear preparation and qualified conversations, without inventing customer stories.
Unresolved approvals & boundaries
- Airport approval of editorial copy, proposed type, accessibility review and photography usage rights. Supplied first-version logos are placed for preview review, not redesigned here.
- Verified references now include administration/director/address, Southern Sky contacts and published services, and dated runway dimensions. Operational confirmation remains required for loading limits, approaches, frequencies, service hours, actual service/hangar availability, Customs arrangements and ground access.
- Development verification: surveyed maps, property availability, facilities, utilities, environmental constraints, permitting, infrastructure costs, terms and feasibility.
- Institutional approvals: additional leadership biographies/directory, Authority membership/meetings, news, projects, careers, tenants, policies and DBE materials. The county-linked “Master Plan 2024” is a one-page airport layout drawing, not a full narrative study.
- County administration, director and address are source-researcher verified, not user-confirmed. An earlier direct fetch returned HTTP 404; today’s page-reading service returned only the county shell/loading content. That access limitation does not negate the researcher verification. Southern Sky’s official page was readable and confirmed the supplied FBO contacts and listed services. FAA master-record PDF and current chart gateways returned HTTP 200 on status checks; AirNav returned HTTP 403 and the county drawing link HTTP 404 to this checker. These are local access limits, not reversals of researcher verification.
- Inquiry delivery is deliberately disconnected. Demo entries stay in this browser. A real delivery workflow, recipients, privacy/retention policy and approval would be required later.
- NOAA rejected the old mostRecent query parameter with HTTP 400. The supported latest-record query returned KPQL observations. KPQL TAF request returned an empty array; absence is not a failure or proof that a forecast is never issued.
- This page is unlinked from primary navigation and marked noindex, but is not password-protected. Preview-only working practice is not access control; no permissions were changed.
Source conflicts handled
The FAA master record is effective October 29, 2026 and printed November 9; runway 17/35 is 6,501 × 150 ft. County tower hours and a March 2026 chart ASOS number are stale: operational hours, ASOS/frequencies and expired chart PDFs are not reproduced. Use the current FAA Chart Supplement and edition gateways. Conflicting acreage scopes are omitted entirely, not converted into available property. Customs requires landing rights and advance coordination, not walk-in or 24-hour clearance.
Demonstration walkthrough
- Homepage: choose aviation or business; locate community resources.
- Pre-arrival checklist: review the five items and official sources; no operational clearance is implied.
- Business overview: compare established information, confirmation requirements and long-term vision.
- Inquiry demonstration: use fictional details; save locally and verify “not sent.”
- Weather: check observation time and forecast coverage; use official sources for flight decisions.
- Public resources: confirm approval-pending documents are not sample download links.
